Skip to main content
Now serving Ohio · Pennsylvania · Texas · Maryland · Illinois · New York
Phase 2 — solarComing Q4 2026

Solar, with the same trust posture.

Three solar surfaces are in the build queue: residential rooftop, commercial rooftop, and commercial land leasing. Each will follow the supply-side posture — methodology public, commission flat, named human bylines, no high-pressure installer sales calls. Join the waitlist on whichever surface fits and you will hear from us before public launch.

Common questions

Quick answers from the editorial desk

When does Seenra solar launch?
Phase 2 timeline is targeting Q4 2026. Waitlist members receive a 30-day window of advance access before public availability in their state.
Will the methodology be public?
Yes. Solar will follow the same posture as the supply-side: published ranking methodology, public commission ranges, eight-rule exclusion matrix, named bylines, public corrections.
Will it be free?
Residential solar lead-gen and shortlist tooling will be free for households, paid by partner installers via flat commission. Commercial PPA + land-leasing operate on different commercial-grade fee structures, all disclosed up front.
How is the supply-side different from solar?
Supply-side is a five-minute switch with no truck roll. Solar is a multi-month installation with a real construction project, financing, and post-install operations. Different product, same trust posture.

In the meantime — lock the supply rate.

Same trust posture, available today on electricity + gas.

Lock your energy rate

5-minute switch · No credit pull · Forever free

Lower my bill